3 year-end work summary of construction workers in 2019

2019-12-19 09:56 [Check it out ] Source: mpsarm.com

Here are a few articles for everyone-3 year-end work summary of construction workers in 2019.

2019 construction workers year-end work summary 3 first

Time flies and time flies. 20xx years have passed in a hurry, and 20xx has also ushered in December. This year has been stressful and fulfilling. Looking into the future, in the days to come, I will sum up experience, learn lessons, put in more effort, and put into work with a more energetic mental state and a solid work style.

For more than a year, under the command of the project manager and department leaders, I have successively experienced the excavation and power generation of various parts of the power plant in the construction of the power plant building and metal structure installation project of the Xinjiang Jilebulak Hydropower Station The penetration of the small pilot tunnel in the inclined section of the tunnel and the various stages of the ongoing power plant pouring. There are achievements and mistakes in this work process. We will continue to carry forward the achievements we have made. We will carefully summarize and deepen our mistakes in our work to minimize the occurrence of work mistakes.

Through these on-site work exercises, I have accumulated some work experience, mainly due to the care and training of project department leaders and the enthusiastic help and teaching of colleagues.

In project construction, one is to focus on safe and civilized construction, the other is to focus on project quality, and the third is to schedule progress. To do a good job in engineering construction, you must first be familiar with the construction drawings, complete the process of getting familiar with the design intent of the drawings and then revising the drawings, and then you must strengthen your understanding of the drawings.

To strengthen coordination and cooperation with various functional departments, to create a good working atmosphere, the construction project operation process involves all aspects, we must do a good job of coordination. During the construction process, a unified pace and the formation of a joint force, to actively report to the leadership and the problems and situations encountered during the project implementation, to communicate and coordinate to ensure the smooth implementation of the project construction.

In order to improve work efficiency and quality, I will focus on the following aspects in the next stage of construction:

1. Strengthen various political studies and improve personal cultivation.

2. Strengthen business learning, improve business quality, and improve work quality.

3. Pay attention to learning new technologies, and use your brain to find ways to improve working methods. Improve work efficiency and be prepared before every job so as not to fight unprepared battles. Summary of the work of construction workers 4. Strengthen the communication with the leaders and colleagues, so that the supervision of the leaders is more in-depth.

The above is a summary of my personal work. I hope that leaders and colleagues will give advice.

2019 construction workers year-end work summary 3 second part

As a construction worker with a certificate from training and many years of construction experience, for many years, I have continuously enriched my professional knowledge. With a pragmatic and pragmatic working attitude, I have explored in practice and experience. Actively develop and innovate and continuously improve your work ability. At the same time as multiple projects were completed, I also perfected myself and achieved myself to a certain extent. Now, I have summarized a series of my own growth and shortcomings. I hope that in the future work, I will be more strict with myself, and I will welcome new work and life in the future.

I. Perform post duties

As a manager of the project department, I attach great importance to controlling the construction quality of the project, coordinating with the construction unit and the supervision unit, as well as the management coordination of the team, and automatically cooperate with the safety section to complete various safety management tasks, and pay close attention to material management to save project costs. The following aspects are important:

1. Engineering quality management.

Every construction project is required to meet high standards and high starting points. In the early stage of construction, pay attention to the skills of the team, give the team members ideological attention, and understand the quality, progress, and safety requirements of the project in terms of skills, laying a good foundation for later construction.

In the implementation of each project, one of the points is strictly required. The carpentry, rebar, and masonry teams are strictly required to construct according to the drawings, and the image materials are reserved. The other team leaders are required to come up to watch and propose themselves. Comments, and ask other teams to work in accordance with the requirements of this point. This method has achieved good results and also brought good effects to the construction quality of the later stage of the project.

2. Management and coordination of teams

(1) In daily work, no matter where they go, the construction manager is the most basic level manager, both the commander and the combatant, the embodiment of the leadership will and opinions, and the responder to the basic level issues. Establish a good self-image, become a model for colleagues in work, and become a trusted partner of colleagues emotionally. Require everyone to work overtime first, and ask everyone to establish high quality standards. We must personally investigate every problem found, pay attention to process control, and control some common quality problems in the bud.

(2) Caring for colleagues: When there is something wrong with colleagues, it will automatically help the class and organize the whole class to care and comfort, forming a family atmosphere.

(3) Attach importance to the training of the leaders of each team. At each meeting, in response to the problems of construction cooperation, I try to make each comrade dominate at least once in order to increase their experience and enable each comrade to stand on his own. To deal with various problems, so that the overall level of business skills of all teams has been improved.

3. Safety management work

In the work process, the automatic cooperation with the Safety Section to complete the safety management and education of the construction personnel is an integral part of each project management.

4. Coordination with construction units and supervision units

As a construction manager, in each project, we attach great importance to the coordination and coordination of the construction unit and the supervision unit, and take the lead in researching and implementing the good suggestions put forward by the construction unit and the supervision unit, and strive to obtain unanimous praise from the construction unit and the supervision unit. Is the best embodiment of the continuous improvement of the work of construction workers.

5. Material management work

Based on the principle of cost-saving, in each actual work process, the control of raw materials is strictly controlled, and every penny is used in engineering for the use of formwork, concrete and steel bars. For example, for small material steel bars, the construction of each floor is completed, and the reinforcement team is required to organize and collect them, and all of them are used during the construction of the lower floor. The idea of cost-saving was implemented in the actions of various teams and teams, and cost-saving was achieved in the project target construction